Hi all, I have a 296 GTB on order. Was originally supposed to arrive roughly in April. I received the final production photo some time in May. No updates since. I suspect it’s arrived at the port, wondering if tariffs negotiations are causing delays. What is the usual time from photo to delivery? Bit bummer as summer is flying by.
Ask your dealer the Status code in the Ferrari system. Status Code | Stage Description W | Waiting List P | Approved by Dealer 00 | Approved by Subsidiary 10G | Approved by HQ 10R | Printed (No more changes) 20 | Chassis Assembly aka Lastratura 30 | Painting 40 | Body work inserted 50 | Body on 60 | Overhaul 70 | Finishing 85 | In factory storage awaiting shipment 90 | Factory Shipment / In Transit 91 | At Port / Arrived at Subsidiary 92 | PDI (Pre-Delivery Inspection) completed at Subsidiary 93 | Subsidiary Shipment / Transport to Dealer 94 | Dealer Accepted 95 | Marketing If your dealer doesn't have it, the best update you want to hear is that it's Status 93 aka on its way. Worst case would be Status 85, which means the cars sitting around in Italy waiting for a shipping slot. Lots of cars destined for US dealers had been stuck at Status 91 for 3-6 months. Mine was at Status 91 from 5/8 to 7/7.
Should be any day my friend. I was stage 91 for 13.5 weeks. I was since 4/8/25 and received the car July 11th